Website by Miles Internet and Maintained by Paul Fryer

View latest issue

Download the latest issue

Follow us on Twitter

Charities supported by PracticalFM

Practical FM - One of the most powerful fm resources on the internet

Business News

Firestone’s Rubbergard™ Provides Modular Solution for Fast Track School Build

Firestone’s Rubbergard™ Provides Modular Solution for Fast Track School Build

Firestone Building Products has enabled the fast track modular construction of a new Academy high school in Manchester with the supply of RubberGard™ EPDM roofing membrane.

The seventh school to join a multi-academy trust, Dean Trust Ardwick was established in temporary accommodation while its £24 million new building was fabricated off site in East Yorkshire by modular specialist, Servaccomm. The modular build enabled the programme to progress while demolition of the former mill on the school’s site was still ongoing.

The 5,508m² modular building provides two and three storey accommodation, including classrooms, labs, a music room, an IT centre, a dining hall and a sports hall. A total of 161 modular units were constructed inside the Servaccomm factory and when each of the upper modular units was watertight, thanks to its factory covering of Firestone’s RubberGard™ EPDM membrane, it could be stored outside, freeing up space in the factory and enabling the modules to be delivered to site on a just in time basis.

Offering excellent elasticity to ensure that the material remains stable post-fabrication, RubberGard™ EPDM remains flexible even in extreme temperatures as low as -450C. It also provides more than 300 per cent elongation, overcoming any risk of tearing or damage as a result of movement stress during the modules’ journey to site, storage or natural settlement post construction.

The RubberGard™ EPDM system was adhered to each building module using odour- and solvent-free water-based adhesives developed by Firestone especially for fast application and safe use inside a modular building factory.

The school is now completed and occupied, thanks to a fast track construction programme that reduced labour requirements and health and safety risk on site while ensuring factory assured build quality.

Dean Trust Ardwick’s headteacher, Susan Findley, commented: “We needed a school building that would provide a safe, secure and flexible learning space for our students while offering accommodation as quickly as possible. The children love our new building and it has been constructed to offer a robust education environment with an EPDM roof that will keep the interior dry for generations to come.”

Reader Reply Number 207004
Firestone Building Products
w:: www.firestonebpe.co.uk

Random Picks

Click to read this articleTraka Checks in At New Five Star, Ned Hotel: Traka is the key management solution of choice for...

Click to read this articleRotherham Care Home Keeps Warm with New Heating & Industrial Boiler Filter : Sheffield based plumbing and heating firm Pro Plumbers...

Click to read this articleEfficient Universities Manage Additional Half A Million Square Metres at Same Cost : • University sector management and maintenance costs...

Click to read this articleHand Hygiene’s Silver Bullet: The highest standards of washroom hygiene can be undone...

Click to read this articleRotherham Care Home Keeps Warm with New Heating & Industrial Boiler Filter : Sheffield based plumbing and heating firm Pro Plumbers...

Adverts